DEC-1998 |
Sociedad Boliviana de Cemento -La Paz, Bolivia.
Design, construction and start-up of the pipeline system in 6”, regulation, filtration and measure of gas for the expansion of the cement factory, with a capacity of 400,000 SCFH. Construction of the internal distribution network, regulation and control systems for the calcinator, oven and hot gas generator; installation and calibration of flow computers through a critical flow test. |
DEC-1998 |
Empresa Petrolera Andina S.A. - Santa Cruz, Bolivia.
Design, supply, installation, and start-up of the compressed air system with two 100 HP oil-free compressor, refrigerated dryers, air filtration and distribution systems. Electro-mechanic assembly. |
DEC-1998 |
Chaco S.A. - Santa Cruz, Bolivia.
Design, engineering, material provision, contruction and start-up of the fluid measuring station of Los Cusis. Installation and calibration of the Mass type measuring system. |
NOV-1998 |
Penspen Ltda. -Inglaterra, U.K.
Technical auditors of the Bolivia – Brazil pipeline for the Hydrocarbon Superintendence. Specialists over the audits of the complete control and measuring systems of the measuring stations of Rio Grande and Mutun, and the compression station of Yacuses. |
NOV-1998 |
TRANSREDES S.A. - Santa Cruz,Bolivia
Modifying engineering and mechanical task towards the AGA 7 and 3 Norms of the natural gas measuring station at the Vibora plant, Guaracachi, Pipeline towards the Altiplano and Industrial Park. Configuration of the flow computer. |
NOV-1998 |
TRANSREDES S.A. - Santa Cruz,Bolivia.
Basic and detail engineering for the construction of the new natural gas filtering, regulation and measuring station in the Guaracachi’s electric energy generation plant. Control and regulation system, flow computerFisher ROC Flowboss (RTU) and a SCADA tele-measuring system. |
OCT-1998 |
Shell Bolivia - Santa Cruz, Bolivia.
Manifold construction and installation of distribution lines in 4” for the diesel-oil storage plant. The work included the systems filtration, measuring (API) and repair tasks of storage tanks according to regulations. |
|