APR-1999 |
Penspen Ltda. - Londres, Inglaterra
Technical audit of the Rio Grande Compression Station, at the head of the Bolivia-Brazil pipeline, with emphasis on gas measures and compressors. |
MAR-1999 |
Penspen Ltda. - Londres, Inglaterra
Final technical audit of the Bolivia-Brazil pipeline 32”, with special emphasis on the control and measuring system of the measuring stations of Rio Grande and Mutun. |
MAR-1999 |
Oxígenos La Paz S.R.L. - La Paz, Bolivia
Design, installation and start-up of a high-pressure, high purity oxygen generation system (2,200 PSIG), with a capacity of 60 bottles per day. It includes a compressed air system, air filtration and sorting, electro-mechanic assembly and an oxygen measuring system. |
MAR-1999 |
Sociedad Maderera Industrial S.R.L. - La Paz, Bolivia
Design, construction, installation and start-up of the pipeline, measuring, filtering and regulation system of natural gas with a capacity for 10,000 SCFH. Gas meter calibration through a critical flow test. |
FEB-1999 |
Hilandería Hnos. Lecona S.R.L. -La Paz, Bolivia
Design, construction, installation and start-up of the pipeline, measuring, filtering and regulation systems to natural gas with a capacity for 15,000 SCFH, including a digital measuring system and calibration of the gas meter through a critical flow test. |
JAN-1999 |
TRANSREDES S.A. - Cochabamba, Bolivia
Design, construction, installation and start-up of a City Gate in the location of Punata with a capacity for 45,000 SCFH. Configuration and calibration through a critical flow test of the RTU Daniel, for its future connection with SCADA. |
JAN-1999 |
TRANSREDES S.A. - Santa Cruz,Bolivia.
Supervision of the assembly and construction of the new filtering, regulation and measuring station of Guaracachi. Supervision of the transportation of the old station. Writing of AS-BUILT documents. Supervision of the calibration of the measuring system. |
|