FEB-2000 |
Sociedad Boliviana de Cemento - La Paz, Bolivia.
Calibration of the gas measuring system for the gas station of the cement factory. Assessment of the calibration factor. Verification of the performance of turbine-type meters. |
JAN-2000 |
Cooperativa Rural de Electrificación Eléctrica (CRE) -Santa Cruz, Bolivia
Turnkey project for material design, specification and supply, assembly and start-up of the gas-input system. Control and measurement for the thermo-electric plant of San Ramon. Configuration of the flow computer. |
DEC-1999 |
Chaco S.A. -Santa Cruz, Bolivia
Turnkey project for the design, specification and supply of materials, assembly and start-up of the natural gas measuring system for the Thermo-electric plant of Bulo-Bulo, with a capacity of 1.5 MMPCH. Configuration of the control system, programming and configuration of the flow computer. |
NOV-1999 |
Grupo Bebidas - Cochabamba, Bolivia
Turnkey installation of the gas measuring system with a capacity of 35,000 SCFH. Installation and configuration of the flow computer, regulation and control system, calibration of the gas meter through the critical flow test. |
AUG-1999 |
Cooperativa Rural de Energía Eléctrica (CRE) -Santa Cruz, Bolivia
Engineering Basic survey in order to provide with natural gas to thermal plants in the areas of Ipias and San Ignacio, iincluding a 3” pipeline and a gas measuring, regulation and filtering system Route selection, diameter optimization of the duct and surface facilities. |
JUN-1999 |
Productor S.R.L. (Aceite Crisol) -Santa Cruz, Bolivia
Design, supply, assembly and start-up of a complete nitrogen generation system via membrane. Assembly and electro-mechanical facilities. |
MAY-1999 |
Gas Trans Boliviano (GTB) - Santa Cruz, Bolivia
Audit, inspection and technical evaluation of the measuring tubes and the control systems of Rio Grande (4 14” tubes) and Mutun (4 16” tubes). |
|