Home
Site Map
Intranet
Webmail Contact
 
ACTUALIZADO A JULIO DE 2005
 
SEP-2000

Genex S.A. – Santa Cruz, Bolivia

Writing of the technical for the construction of a Compressed Natural Gas plant in the city of Santa Cruz. Detailed engineering, material specifications and supply, preparation of maps for the gas system, and the measuring, electrical, architectonic location systems, technical descriptive memories and task execution schedule.

AUG-2000

Chaco S.A. -Santa Cruz,Bolivia

Assembly, installation and calibration of instruments in well reception manifolds and triphase sorters at the Bulo-Bulo camp. Electric material and instrument specifications and supply.

JUN-2000

Incerpaz S.A. - La Paz,Bolivia

Assesment and diagnosis of the natural gas measuring system. Repair of the meter and installation and calibration of the flow computer.

JUN-2000

TRANSREDES S.A. (IST). - Santa Cruz,Bolivia

Project “Flexibilization of Río Grande”, installation of control valve systems operated to enter to the compressing plant Rio Grande. Signal wiring and programming of the Fisher ROC 364 to remotely manage and control valves. Configuration and programming of the RTU.

MAY-2000

Grupo Genergys - La Paz,Bolivia

Turnkey project for the installation of a complete dual system of natural gas, with a double control system and remote measuring system with a capacity of 150,000 SCFH for the thermo-electric plant. Manifold construction of control and measurement of thermal efficiency and calibration of the gas meter using a critical flow test.

APR-2000

TRANSREDES S.A. - Santa Cruz,Bolivia

Engineering, material specifications and customization of the field to comply with the AGA 3 and 7 regulations, of 15 natural gas measuring stations at the district of Cochabamba and Sucre. Installation of the flow computers, programming and configuration of the SCADA system.

APR-2000

Gas Oriente Boliviano S.A. - Santa Cruz,Bolivia

Joint project with the Petrotech company to supply the SCADA system for the Cuiaba pipeline. In charge of the installation of remote terminals and servers of the local control room in Santa Cruz.