APR-2001 |
YPFB - Tarija,Bolivia
Maintenance of the system of percentage measurement on GLP storage tanks, with the repair and calibrationof relief valves on tanks at the Villamontes zone. |
FEB-2001 |
International Fuels -La Paz,Bolivia
Inspection, repair and calibration of the gas meter for the Compressed Natural Gas plant. |
FEB-2001 |
YPFB - La Paz,Bolivia
Calibration and repair of the VAREC measuring system on GLP tank at the Senkata plant according to regulations. |
JAN-2001 |
Grupo Genergys - La Paz,Bolivia
Basic and detail engineering project to supply a complete system of natural gas from the transportation line of Transredes (GAA) to the thermoelectric plant. Selection of the route for 2,500 m., diameter optimization for a 114,000 SCFH flow, connection system to a pipeline with an excess flow-valve, heating regulation and measurement system. The measuring system includes a flow computer and a prevision of tele-measuring with the SCADA system. |
JAN-2001 |
Transredes S.A. - Santa Cruz,Bolivia
Supervision of equipment and instrument assembly for five mass-type fluid measuring systems at the Tiguipa Station. Instrument and control signal installation of the meters to the OMNI 6000 flow computers. Electric construction and laying of lines and signals. Calibration of the instruments and RTU’s OMNI programming, start-up and writing of as-built documentation.
Calibration of the five mass measuring systems using unidirectional volumetric provers. |
OCT-2000 |
Chaco S.A. -Santa Cruz,Bolivia
Modification of the electrical facilities, control lines and instruments in the manifold of gas reception from wells and on triphase sorters at the Bulo-Bulo field. |
OCT-2000 |
Transredes S.A. - Santa Cruz,Bolivia
´Turnkey´ project for the natural gas filtration and regulation systems for the Carrasco-Valle Hermoso station, including basic design, detail engineering and equipment specifications, equipment provision, construction and writing of as-built documentation. |
|