Home
Site Map
Intranet
Webmail Contact
 
ACTUALIZADO A JULIO DE 2005
 
NOV-2001

CLHB - Santa Cruz,Bolivia

Inspection and diagnosis of 40 measuring systems on oil derived tank loading isles at the Senkata, Palmasola, Oruro and Valle Hermoso Stations. Programming and configuration of the flow computers AccuLoad II to dispatch at corrected temperatures. Installation and start-up of mechanical temperature compensators on positive displacement meters at the Senkata Station. Installation and enabling of loading isles with assembly of control valves and explosion-proof electrical facilities.

OCT-2001

United Furniture - La Paz,Bolivia

Sizing and provision of two Gardner Denver air compressors, with a total potential capacity of 250 HP, including air treatment and drying systems with a refrigerated dryer and a filter bank. Installation an start-up.

SEP-2001

YPFB - Santa Cruz,Bolivia

Valve maintenance in manifold, relief valve maintenance and re-calibration, tank appraisal and maintenance of the percentage level meter at the Villamontes zone for the GLP storage systems.

AUG-2001

TRANSPORTADORA SAN MARCOS (PETROBRAS) - Santa Cruz,Bolivia

Detail Engineering for the provision of equipment, construction, electrical installation, equipment and instrument calibration, and configuration of 6 OMNI 3000 flow computers for the measuring systems of the Mutun, Soframaq stations, and the San Marcos Pipeline. Installation of SCADA systems with cellular communication.

JUN-2001

CLHB - Cochabamba,Bolivia

´Turnkey´ project for a treatment, regulation, and measuring system of natural gas for the provision of fuel gas in the Pump Station Oruro. Writing of the project for its approval, installation, assembly and activation.

MAY-2001

ANDINA SA - Santa Cruz,Bolivia

Installation of level controllers, automatic drainers, pressure and temperature instruments and instruments in general at the PECO sorting filter for the expansion project of the Natural Gas Compression plant of Rio Grande for the Bolivia – Brazil pipeline.