SEPT-2002

Cerámica Santini (Grupo Incerpaz) - La Paz, Bolivia

Detail engineering to provide equipment, construction, installation, critical flow test, and start-up of the filtrating system, regulation and measurement of natural gas for the supply of their drying ovens.

AUG-2002

Batebol -Santa Cruz, Bolivia

Sizing, provision, installation, calibration, and start-up of an oxygen generating system, which includes the jack-type air compressor, PSA-type oxygen concentrator (Pressure Swing Adsorption), storage tanks, etc.

AUG -2002

Superintendencia de Hidrocarburos - La Paz, Bolivia

Consultancy Service to determine Costs and Fees of other Hydrocarbon Transports.

MAY-2002

TRANSREDES S.A. - Santa Cruz, Bolivia

‘Gas Compression Station Entre Ríos’. Provision and installation of the perimeter grounding system and station signals grounding; provision, assembly and complete electrical installation of the plant, lights, MMC, pass-boxes. Etc. Installation of instruments and laying of signals, PIT instrument calibration, fire sensors, gas sensors, etc. Cold essays, start-up support and starting.

MAY-2002

CLHB - Santa Cruz, Bolivia

Inspection and diagnosis of 15 positive displacement-type measuring systems on tank loading isles of oil derived products on the Tarija, Sucre, Potosi, Trinidad and Santa Cruz Stations. Installation, programming and configuration of the AccuLoad II – Smith Meter flow computers, for the dispatch at corrected temperature. Installation and start-up of mechanical temperature compressors on positive displacement meters. Installation and enabling of loading isles with the assembly of control valves and explosion-proof electrical facilities.

APR-2002

TRANSREDES S.A. -Santa Cruz, Bolivia

‘Flow Control Systems GOB-Chiquitos Station to derive a Pipeline to Cuiaba´. Design, basic and detail engineering, selection and equipment provision, construction, installation, mechanical and electric assembly,programming of the Fisher ROC312 controller, configuration of the on-line chromatograph, SCADA connection, PID programming of the of control valve loop, testing and start-up.