ACTUALIZADO A JULIO DE 2005
 
DEC-2003

CRE - Puerto Suárez, Bolivia

Turnkey provision of conditioning bridges, natural gas regulation and measurement for the thermoelectric plant German Bush.

DEC-2003

TRANSREDES S.A. - Santa Cruz, Bolivia

Regularization of measurement bridges in the Carrasco and El Palmar stations. Technical audit and modification of the measuring bridge El Palmar.

DEC-2003

YPFB - La Paz, Bolivia

Clearing and Maintenance of the Varec Level Measuring System.

NOV-2003

TRANSREDES S.A. - Santa Cruz, Bolivia

Commissioned and start-up of the instrumentation for the EDS III, on the Safari I, Sica Sica, Torrepampa stations, and Terminal Station of Santa Cruz.

NOV-2003

GOB – TRANSREDES S.A. - Santa Cruz, Bolivia

Enabling of the Shafer actuators in the pipeline. Installation, confirmation, calibration and start-up of 7 actuators of the line cut
NOV-2003

REPSOL YPF - Santa Cruz, Bolivia

Detection systems of propane leaks, Rio Grande Plant. Engineering and design of a propane gas detection system for the compressor area. Specification and import of equipment. Assembly and signal connection to safety PLC, change in customization of the PLC’s logic, change of the Panel View (on-going project)

AUG-2003

COORPORACIÓN ANDINA DE FOMENTO (CAF) - Santa Cruz, Bolivia

Consultancy Survey “Development Project of the Natural Gas Distribution System through Networks”, writing of the following reports:
Report 1 – Technical Report on the Current Natural Gas Distribution Systems, Report 2 – Report on the Required Projection, Report 3 – Technical Report and Relevant Aspects of Engineering and the Expansion Plan, Report 4 – Report on Investment Plan, Report 5 – Report on Operating Costs, Management and Maintenance, Report 6 – Report on the GNV Required Potential, Report 7 – Technical Report on the GNV Investment, Operative and Maintenance Costs, Report 8 – Conclusions and Recommendations, and Report 9 – Report on the Investment Plan for the Rural Population Systems.